Clicky

Beta Max Videos

Scaffold Company Attributes 0.58 EMR Rating to Using Maxial Hoist in Boilers

– Posted in: Beta Max Videos, Case Studies, Industrial, Maxial Scaffold Hoist, News & Press Releases

November, 2015—Every manufacturer loves getting solid testimonials from the people in the field that use their equipment, and Beta Max Hoists recently received the type of testimonial that companies dream about getting. StructSure Scaffold & Insulation, a subsidiary of MHS Legacy Group, is based in the Ohio Valley.  They specialize in scaffold and insulation services for [...]

Shadrock Masonry Builds Texas A&M Dome

– Posted in: Beta Max Videos, Case Studies, Rack and Pinion Hoist

    Project: Masonry Exterior of Central Academic Building  Location: Texas A&M San Antonio Campus Demands:  Transport brick & mortar to 70 feet high building dome safely and economically. Solution: Beta Max Max Climber 2000 Material Hoist (Rack & Pinion Company: Shadrock & Williams Masonry Ltd.    Shadrock and Williams Masonry contacted Beta Max Hoists [...]

Time Lapse of Personnel Lift Install at Tennis Tournament

– Posted in: Beta Max Videos, Case Studies, construction, News & Press Releases, Rack and Pinion Hoist
Time Lapse Nussli BB&T

Nussli constructs temporary event structures (grandstands, stadiums, stages, etc.) all over the world.   They do a great job and are hard at work this week constructing a stadium for an upcoming tennis tournament.   Time lapse video of the construction captured install and testing of a Beta Max personnel hoist that will be used [...]

Questions? Call 800.644.6478       Quotes? Click HERE.

Beta Max Hoist, P.O. Box 2750, Melbourne, FL 32902 | Phone: 800.644.6478 | Privacy Policy | © 2013 www.betamaxhoist.com All rights reserved.