Clicky

2000 PMB Solves Washington Monument Restoration Issue

 

Thank you to Joel Ross from Scaffold Resource for providing photos and key information for the case study.

A longer, more detailed video is coming that will cover

  • the use of friction instead of mechanical ties to secure scaffolding to structure
  • the elevated temporary steel platform 30 feet in the air, spanning the existing historical structure that served as the hoist base platform – which would not be possible with a larger hoist.

Questions? Call 800.644.6478       Quotes? Click HERE.

Beta Max Hoist, P.O. Box 2750, Melbourne, FL 32902 | Phone: 800.644.6478 | Privacy Policy | © 2013 www.betamaxhoist.com All rights reserved.